Английский язык, вопрос задал 2007flow2007 , 2 года назад

Why was the Millennium Bridge closed after its opening?

Ответы на вопрос

Ответил bongo234jh
0

Відповідь:

Unexpected lateral vibration due to resonant structural response caused the bridge to be closed on 12 June for modifications. Attempts had been made to limit the number of people crossing the bridge, which led to long queues but were ineffective to dampen the vibrations.

Пояснення:

Новые вопросы